Get in touch:
+44 1925 720 090
Contact me

BS EN 61439 is now mandatory. All our relevant products meet this standard.

 

With more than 80 staff, our design, build, test and installation team build a wide range of motor control centres & low voltage assemblies. All our product range is CE marked and meets the latest British & European Standards.

Fault level Current rating Form Type IP rating Access Cable
entry
50 kA/3 secs
or 80 kA/1 sec
or 100kA/1 sec
Up to 6300A 4 2 to 7 IP31/IP42
(Tx IP2X)
Front/rear Top/bottom
Fault level Current rating Form Type IP rating Access Cable
entry
50kA/3 secs
or 80kA/1 sec
or 100kA/1 sec
Up to 6300A 4 2 to 7 IP31/IP42 Front/rear Top/bottom
Fault level Current rating Form Type IP rating Access Cable
entry
25kA/1 sec or
50kA/1 sec
Up to 3200A 1
2b
3b
4
-
2
2
2 to 7
IP54 Front/rear Top/bottom
Fault level Current rating Form Type IP rating Access Cable
entry
- - 2 - IP54
IP65
Front/rear Top/bottom
Fault level Current rating Form Type IP rating Access Cable
entry
50kA 630A 4 2 to 7 54 Front/
Rear
Top/
Bottom
Fault level Current rating Form Type IP rating Access Cable
entry
- - 1/2 - IP54
IP65
Front / Rear Top/bottom
Fault level Current rating Form Type IP rating Access Cable
entry
- - 1/2 - IP54
IP65
Front / Rear Top/bottom

Each assembly is designed to the clients exact requirements. We individually design panels to fit where space is restricted or the environment is difficult. Arc fault protection is also available.

Design

Our engineering team use a powerful design package to optimise the design process - delivering shorter lead times, more consistent designs and no rework. Our design emphasis is on usability – we challenge our designs with questions such as: “Is there enough space for the field cabling ?” or “Is there good access to enable the system to be maintained ?”

Build

Our design package gives us a seamless transition to our build phase, with clear, unambiguous documentation transferring to our build team enabling us to build efficiently and minimise errors.

Test

Comprehensive tests culminating in a full functional test are carried out at our Warrington factory with the recorded results forming part of the project specific technical file.

Boulting MCC
Capability

Recent case studies

Energy from Waste

The client required a plant control system to enable the ...

Upgrade - Client First

Phased implementation of control system on live clean water ...

Energy Management

Energy Management & Power Quality systems enable users ...

We partner with the industries leading equipment vendors including:

Siemens Rockwell ABB

Contact form

Area of interest...

About you...

Further information...