Our client is one of the UKs leading water and waste water companies. This project is part of a programme to upgrade all Main Works Control Systems (MWCS) providing clean water to more than 3 million homes and businesses.

Overview

Our client is one of the UKs leading water and waste water companies. This project is part of a programme to upgrade all Main Works Control Systems (MWCS) providing clean water to more than 3 million homes and businesses.

The Brief

The brief, covering a wide ICA and Electrical scope was to completely upgrade the existing site control system – 15 PLCs, Fibre Optic Network & SCADA update.

New System Architecture

Scope of Supply

• Project Management
• Detailed Design
• Reverse Engineering of existing PLCs
• FDS
• Programming & Configuration
• New and Modified Panels
• Electrical Installation
• Fibre Installation
• Instrument Installation
• Installation of network switches
• Commissioning
• Interface with Wide area SCADA

Scope of Services

• Site Surveys
• Costed Scheme for Capital Sanction
• CDM Principal Contractor & Designer Roles

Key Features

• Rockwell ControlLogix and CompactLogix PLCs
• Hirschmann network components
• Redundant power (Mains/Generator/UPS)
• Remote Maintenance

Value Added by Boulting

• Whole project ownership
• Full life cycle support – early involvement
• Standard communications design
• Low risk upgrade philosophy
• Ongoing support