Enquiry Call

Energy from Waste project

As part of a waste to energy plant that recycles household bin waste and converts to reusable energy with only 8% of black bag waste going to landfill, Boulting are building furnaces with an order value of c.£2.9m.  The construction consists of three fuel furnaces built to the same specification, each weighing approximately 95 Tonnes and being constructed in three phases consisting of a fuel hopper, a fuel chute and a fuel feeder unit.  The completed furnaces are due for site installation in April 2014.

Back