Enquiry Call

Latest projects

  • Energy saving of £147k per annum at Large RWPS

    Boulting Pump Management implemented Pump System Optimisation (PSOp) to help Anglian Water reduce their carbon footprint.  Through a collaborative approach with Anglian Water’s Operations and Energy Team , the root causes of…

    More...

  • Infrastructure and Network Upgrade supports expansion

    Boulting and NETbuilder provided a client with large production facility, the confidence and ability to expand following a review and overhaul of an existing failing industrial network infrastructure. An evolved infrastructure lead…

    More...

  • Main Works Control System Upgrade – clients first iMCC project

    Phased implementation of control system on live clean water plant, innovative Siemens architecture, clients first iMCCs Overview This major site provides clean water thousands of homes and businesses. Following on from the…

    More...

  • Large Pumping Station saved 224, 376 kWh per annum

    Pump System Optimisation and Reservoir modelling for improved efficiency Using our tried and tested Pump System Optimisation (PSOp) and Reservoir Modelling software we are able to minimise energy consumption and cost.  A…

    More...

  • Borehole optimisation saved 273,750 kWh per annum

    Boulting Pump Management is far more than just pump testing. Using our tried and tested Pump System Optimisation (PSOp) and Reservoir Modelling software we are able to minimise energy consumption and cost….

    More...

  • IT and OT Infrastructure Modernisation

    A Global-flooring manufacturer wished to improve efficiency and productivity in its UK manufacturing facility. Boulting and NETbuilder provided a cohesive IT and OT infrastructure and ongoing support for an end to end…

    More...

  • Delivering automated ticket solutions

    Boulting successfully delivered a core network solution based around a high speed, high availability, resilient and scalable architecture to deliver real time (internet based) payment and penalty services. Overview The extensive expansion…

    More...

  • Tier 4 Data Centre in West London

    Demanding applications require high availability power to maintain critical services Overview Client Merrill Lynch required a new offsite data centre in West London. The project comprised construction of a 2000 m2 data…

    More...