Enquiry Call

Adding a new process enables improved environmental performance

As part of a drive to improve environmental performance, our client, a Global Pharmaceutical major, has invested in a new process at one of its UK manufacturing sites. The new process, installed in an existing production facility allows a byproduct of the manufacturing process to be recycled and re-used many times.

Overview

As part of a drive to improve environmental performance, our client, a Global Pharmaceutical major, has invested in a new process at one of its UK manufacturing sites. The new process, installed in an existing production facility allows a byproduct of the manufacturing process to be recycled and re-used many times.

The Brief

The client required the new process to be integrated into the existing plant with minimal disruption.

Scope of Supply

  • Functional Design Specification
  • PLC & Scada supply and programming
  • MCC & Control Panel Design & Build
  • Electrical Installation
  • Mechanical Installation
  • Inspection, Testing and Commissioning

Scope of Services

  • Site Survey
  • Design
  • Project Management
  • OEM Liaison

Key Features

  • Seamless integration with existing plant
  • Interfacing with new OEM packaged plant
  • Process control validated to Gamp5

Value Added by Boulting

  • Whole scope ownership: Control System and M&E
  • Low risk installation philosophy
  • Ongoing support

Download as a PDF here

 

Back